Sign In | Join Free | My xxjcy.com
China Guangdong MEI-AL Technology Co., Ltd. logo
Guangdong MEI-AL Technology Co., Ltd.
Professional,focus, honest, win-win
Verified Supplier

3 Years

Home > Anodizing Production Line >

2000T/M Aluminum Anodizing Line For Metal Electroplating Surface Treatment

Guangdong MEI-AL Technology Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

2000T/M Aluminum Anodizing Line For Metal Electroplating Surface Treatment

Brand Name : MEI-AL

Model Number : APL-2000T

Place of Origin : CHINA

MOQ : 1set

Price : RMB20,000,000-30,000,000/set

Payment Terms : T/T

Supply Ability : 1set/6 months

Delivery Time : 180-200days

Packaging Details : Export Stander Packing

Color : All color as clients' required

Feature : Smart inventory management

Material of Tank : PP, PVC, Stainless Steel

Max Profile Length : 6500mm

Tanks Inside Size : 8000*width*3500

Voltage : 380V~415v

Contact Now

2000T/M Aluminum Anodizing line for Metal electroplating surface treatment

一. Pruduction: 

1.Increasingly, anodizing production lines are incorporating remote monitoring and control capabilities, allowing key personnel to access and manage the production processes from off-site locations. This enhances operational flexibility and responsiveness.

2.Anodizing production lines may utilize specialized simulation software to model and optimize various aspects of the anodizing process, such as current distribution, coating thickness, and process kinetics.

3.Advanced anodizing production lines employ sophisticated metrology and inspection tools, including optical profilometry, X-ray fluorescence, and automated visual inspection systems, to ensure precise measurement and verification of critical coating properties.

二. Design Condition:

1 Alloy Aluminium 6061 to 6063 or others
2 Anodizing film thinkness The desired anodizing film thickness is 10-12µm (microns)
3 Average coverage area The average coverage area is 350m² per ton of aluminum profiles
4 Maximum aluminum profile length 6500mm
5 Extrusion ratio 2.5kg/m²
6 Working hour/m 300d/m x 20h/d = 600h/m
7 Racking system Three fixtures /rack
8 Racking operation Manual
9 Equipment Usage Rate 0.9
10 Power supply AC 3phase 380v 50hz
11 Control Power AC220V 50Hz
12 Water supply 2kg/cm²·G
13 Hot steam 6kg/cm²·G
14                   Compressor air                                                  6kg/cm²·G

四. Treatment Process:

  1. Degreasing
    (1) 6jig(rack)/ tank x 1 tank
    =6jig(rack)
    (2) treatment time: 2-5min
  2.  Alkaline Etching 
    (1) 6jig(rack) / tank x 2 tank
    =12jig(rack)
    (2) treatment time: 3-15min
  3.  Neutralization
    (1) 6jig(rack) / tank x 1 tank
    =6jig(rack)
    (2) treatment time: 1-5min           
  4.  Anodizing
    (1) 3 jig(rack)/tank x 6tanks = 18jig(rack)
    (2) Current density: 130A/m²
    (3) Process time: 30min
    (4) Unprocess time: 10min
    (5) Total time 30+10=40min
          

          (6) Average anodizing layer : 0.36*1.3*30*0.77 =10.81um

  1.  Colour 1

                     1) Clour process: Mix Salts

                     2) Quantity:3 jig(rack)/tank x 1tanks = 3jig(rack)

                     3) Current density: 70A

                     4) Process time: 2-8min

 

      6. Sealing
           1) Sealing menthod:  Sealing at Medium or Normal Temperature
           2) 
Quantity: 6jig(rack)/tank x 1 tank
           3) Process time 10-15min

五.Process Tank

  1. Degreasing 【Free sulfuric acid 180±30 g/l】 1 Tank
  2. Alkaline Etching【Free alkali 40-60g/l,Al3+ 30-120g/】 2 Tanks
  3. NeutralizationFree sulfuric acid180±20g/l】 1 Tank
  4. Anodising 【Free sulfuric acid 140-180g/l,Al3+≤20g/l】 6 Tanks
  5. Colouring 【stannous sulfate 3-8g/l,Free sulfuric acid 15-25g/l,PH 0.8-1.2】 3 Tanks
  6. Medium Temperature Sealing【PH 5-6.5,Nickel ion0.8-1.3g/l,Fluorion0.3-0.7 g/l】 3 Tank

 

六. Design Parameter and Setting

       1. Anodizing treatment area:
              1) Each anodizing process tank need 40min ,where total jig(rack)/year:

                   ( 3 rack x 6 tank x 60min/h) ÷40min x600 hour =16200jig(rack)

2) Design 50m²/jig(rack) . Where every tank is 100m²
3) 
Area treatment/year : 16200jig(rack)x 50m² /jig =810000m²

 

2. Anodizing treatment weight:
        Monthly output : 810000m²÷350m²/T*0.9=2082T≧2000T

 

3. Power consumption:
        1) Anodising Tank:100m²/tank* 130A/ m²÷0.9=14444A/tank

           Power Rectifier : 15000A =6unit
        2) Clouring tank: 100㎡/tank×70A/m²÷0.9 = 7777A/tank

   Colour Rectifier : 8000A =3 unit 

 

七. Process Chat

Discription for Un
1 De Degreasing
2 Rs Rinsing
3 HW Rs Hot Water Rinsing
4 AE Alkaline Etching
5 Ne Neutralization
6 An Anodizing
7 Cl Coloring
8 Sl Sealing
9                         MU                                  Material Unloading
10                          Pc                                           Packing

2000T/M Aluminum Anodizing Line For Metal Electroplating Surface Treatment

 

 

 

 


Product Tags:

Metal Electroplating Surface Treatment Anodizing Line

      

2000T/M Aluminum Anodizing Line

      
Buy cheap 2000T/M Aluminum Anodizing Line For Metal Electroplating Surface Treatment product

2000T/M Aluminum Anodizing Line For Metal Electroplating Surface Treatment Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Guangdong MEI-AL Technology Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)